What happens during requirement review?
The brief starts by defining equipment and site conditions. We identify missing information that could change a supplier's proposal, including water source and quality, design flow, operating pressure and the electrical or control interface. Open questions stay visible rather than becoming assumed specifications.
Factory matching and quotation comparison depend on the exact request. Availability, MOQ, samples, inspection arrangements and lead time must be confirmed with a prospective supplier. For a new installation, the project owner should also arrange qualified site design and installation review.